500 questions Wai answers inside Claude and ChatGPT
Connect Wai to your AI app once and ask any of these in plain words. Wai's own engines answer them - site drawings with quantities, building and data-center energy on the real climate of the place, deterministic engineering and finance calculators, and official open data with dates and links. Türkiye, the EU and the US first, then worldwide.
Add Wai to your AI app (1 minute)
https://wht-ai.com/mcp/index.phpCopy
Claude: open Connectors, choose "Add custom connector" and paste the address above.
ChatGPT: open Apps / Connectors (developer mode), create a new connector with the same address.
Sign in with your Wai account when the app asks - then ask a question below.
Türkiye
Draw a 150 MW wind farm layout at 40.19, 29.06 (Bursa) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 200 MW / 800 MWh battery storage (BESS) site at 37.16, 38.79 (Şanlıurfa)
Site drawing wai_draw_site
Copy
Draw a 100 MW wind farm layout at 37.16, 38.79 (Şanlıurfa) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 100 MWp solar PV farm layout at 37.87, 32.48 (Konya) with its quantities
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 38.50, 43.38 (Van): 200 MWp PV + 100 MW / 400 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 20 MW green hydrogen electrolyser plant at 37.87, 32.48 (Konya)
Site drawing wai_draw_site
Copy
Draw a 150 MW wind farm layout at 36.90, 30.71 (Antalya) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 100 MW / 400 MWh battery storage (BESS) site at 40.19, 29.06 (Bursa)
Site drawing wai_draw_site
Copy
Draw a 200 MW / 800 MWh battery storage (BESS) site at 38.72, 35.48 (Kayseri)
Site drawing wai_draw_site
Copy
Draw a 20 MW green hydrogen electrolyser plant at 36.90, 30.71 (Antalya)
Site drawing wai_draw_site
Copy
Draw a 10 MW green hydrogen electrolyser plant at 39.65, 27.88 (Balıkesir)
Site drawing wai_draw_site
Copy
Draw a 50 MW wind farm layout at 39.65, 27.88 (Balıkesir) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 100 MWp solar PV farm layout at 37.18, 33.22 (Karaman) with its quantities
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 36.90, 30.71 (Antalya): 100 MWp PV + 50 MW / 200 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 150 MW wind farm layout at 39.90, 41.27 (Erzurum) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 38.72, 35.48 (Kayseri) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 20 MWp solar PV farm layout at 37.00, 35.32 (Adana) with its quantities
Site drawing wai_draw_site
Copy
Draw a 20 MW data center campus at 37.07, 37.38 (Gaziantep) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 200 MW / 800 MWh battery storage (BESS) site at 37.18, 33.22 (Karaman)
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 39.93, 32.86 (Ankara): 200 MWp PV + 100 MW / 400 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 50 MW data center campus at 40.15, 26.41 (Çanakkale) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 37.87, 32.48 (Konya) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 200 MW / 800 MWh battery storage (BESS) site at 37.00, 35.32 (Adana)
Site drawing wai_draw_site
Copy
Draw a 200 MW / 800 MWh battery storage (BESS) site at 37.07, 37.38 (Gaziantep)
Site drawing wai_draw_site
Copy
Draw a 200 MWp solar PV farm layout at 39.93, 32.86 (Ankara) with its quantities
Site drawing wai_draw_site
Copy
Draw a 20 MW green hydrogen electrolyser plant at 37.07, 37.38 (Gaziantep)
Site drawing wai_draw_site
Copy
Draw a 50 MW green hydrogen electrolyser plant at 37.97, 34.68 (Niğde)
Site drawing wai_draw_site
Copy
Draw a 20 MW green hydrogen electrolyser plant at 37.16, 38.79 (Şanlıurfa)
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 37.18, 33.22 (Karaman) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 50 MW data center campus at 37.97, 34.68 (Niğde) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 10 MW green hydrogen electrolyser plant at 40.15, 26.41 (Çanakkale)
Site drawing wai_draw_site
Copy
Draw a 100 MW / 400 MWh battery storage (BESS) site at 38.50, 43.38 (Van)
Site drawing wai_draw_site
Copy
Draw a 100 MW / 400 MWh battery storage (BESS) site at 39.93, 32.86 (Ankara)
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 37.16, 38.79 (Şanlıurfa): 50 MWp PV + 25 MW / 100 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 150 MW wind farm layout at 37.18, 33.22 (Karaman) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 20 MWp solar PV farm layout at 37.97, 34.68 (Niğde) with its quantities
Site drawing wai_draw_site
Copy
Draw a 200 MWp solar PV farm layout at 36.90, 30.71 (Antalya) with its quantities
Site drawing wai_draw_site
Copy
Draw a 50 MW wind farm layout at 38.50, 43.38 (Van) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 37.18, 33.22 (Karaman): 50 MWp PV + 25 MW / 100 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 20 MW green hydrogen electrolyser plant at 38.42, 27.13 (İzmir)
Site drawing wai_draw_site
Copy
Konya yakınında (37.87, 32.48) 10 MWp güneş santrali saha yerleşimini çiz, metrajı ile
Site drawing wai_draw_site
Copy
Karaman yakınında (37.18, 33.22) 25 MWp güneş santrali saha yerleşimini çiz, metrajı ile
Site drawing wai_draw_site
Copy
Şanlıurfa yakınında (37.16, 38.79) 25 MWp güneş santrali saha yerleşimini çiz, metrajı ile
Site drawing wai_draw_site
Copy
Antalya yakınında (36.90, 30.71) 50 MWp güneş santrali saha yerleşimini çiz, metrajı ile
Site drawing wai_draw_site
Copy
İzmir yakınında (38.42, 27.13) 50 MWp güneş santrali saha yerleşimini çiz, metrajı ile
Site drawing wai_draw_site
Copy
Ankara yakınında (39.93, 32.86) 25 MWp güneş santrali saha yerleşimini çiz, metrajı ile
Site drawing wai_draw_site
Copy
Kayseri yakınında (38.72, 35.48) 50 MWp güneş santrali saha yerleşimini çiz, metrajı ile
Site drawing wai_draw_site
Copy
Gaziantep yakınında (37.07, 37.38) 100 MWp güneş santrali saha yerleşimini çiz, metrajı ile
Site drawing wai_draw_site
Copy
Erzurum yakınında (39.90, 41.27) 25 MWp güneş santrali saha yerleşimini çiz, metrajı ile
Site drawing wai_draw_site
Copy
Bursa yakınında (40.19, 29.06) 50 MWp güneş santrali saha yerleşimini çiz, metrajı ile
Site drawing wai_draw_site
Copy
Adana yakınında (37.00, 35.32) 50 MWp güneş santrali saha yerleşimini çiz, metrajı ile
Site drawing wai_draw_site
Copy
Çanakkale yakınında (40.15, 26.41) 10 MWp güneş santrali saha yerleşimini çiz, metrajı ile
Site drawing wai_draw_site
Copy
Konya (37.87, 32.48) için 50 MW / 4 saatlik BESS sahası çiz
Site drawing wai_draw_site
Copy
Karaman (37.18, 33.22) için 20 MW / 4 saatlik BESS sahası çiz
Site drawing wai_draw_site
Copy
Şanlıurfa (37.16, 38.79) için 20 MW / 4 saatlik BESS sahası çiz
Site drawing wai_draw_site
Copy
Antalya (36.90, 30.71) için 20 MW / 4 saatlik BESS sahası çiz
Site drawing wai_draw_site
Copy
İzmir (38.42, 27.13) için 100 MW / 4 saatlik BESS sahası çiz
Site drawing wai_draw_site
Copy
Ankara (39.93, 32.86) için 100 MW / 4 saatlik BESS sahası çiz
Site drawing wai_draw_site
Copy
Kayseri (38.72, 35.48) için 100 MW / 4 saatlik BESS sahası çiz
Site drawing wai_draw_site
Copy
Gaziantep (37.07, 37.38) için 20 MW / 4 saatlik BESS sahası çiz
Site drawing wai_draw_site
Copy
Heating and cooling loads and yearly energy of a 4-storey hospital 80 × 40 m in Çanakkale (40.15, 26.41)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 4-storey hospital 80 × 40 m in Konya (37.87, 32.48)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in Karaman (37.18, 33.22)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a single-storey factory 120 × 60 m in İzmir (38.42, 27.13)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 6-storey hotel 60 × 20 m in Antalya (36.90, 30.71)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a single-storey factory 120 × 60 m in Karaman (37.18, 33.22)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 5-storey office building 40 × 20 m in Van (38.50, 43.38)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in Gaziantep (37.07, 37.38)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in Şanlıurfa (37.16, 38.79)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 6-storey hotel 60 × 20 m in Konya (37.87, 32.48)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 6-storey hotel 60 × 20 m in Adana (37.00, 35.32)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 6-storey hotel 60 × 20 m in İzmir (38.42, 27.13)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 6-storey hotel 60 × 20 m in Çanakkale (40.15, 26.41)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 4-storey hospital 80 × 40 m in Niğde (37.97, 34.68)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in Kayseri (38.72, 35.48)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 4-storey hospital 80 × 40 m in Antalya (36.90, 30.71)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 5-storey office building 40 × 20 m in İzmir (38.42, 27.13)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a single-storey factory 120 × 60 m in Şanlıurfa (37.16, 38.79)
Building energy wai_building_energy
Copy
Konya'da 5 katlı 40 × 20 m ofis binasının ısı kaybı / ısı kazancı ve yıllık enerjisi
Building energy wai_building_energy
Copy
Karaman'da 5 katlı 40 × 20 m ofis binasının ısı kaybı / ısı kazancı ve yıllık enerjisi
Building energy wai_building_energy
Copy
Şanlıurfa'da 5 katlı 40 × 20 m ofis binasının ısı kaybı / ısı kazancı ve yıllık enerjisi
Building energy wai_building_energy
Copy
Antalya'da 5 katlı 40 × 20 m ofis binasının ısı kaybı / ısı kazancı ve yıllık enerjisi
Building energy wai_building_energy
Copy
İzmir'da 5 katlı 40 × 20 m ofis binasının ısı kaybı / ısı kazancı ve yıllık enerjisi
Building energy wai_building_energy
Copy
Ankara'da 5 katlı 40 × 20 m ofis binasının ısı kaybı / ısı kazancı ve yıllık enerjisi
Building energy wai_building_energy
Copy
PUE, free-cooling hours and water use of a 100 MW data center in Ankara (39.93, 32.86)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 100 MW data center in Konya (37.87, 32.48)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 20 MW data center in Bursa (40.19, 29.06)
Data center energy wai_datacenter_energy
Copy
İstanbul'da 30 MW yapay zekâ veri merkezinin PUE değeri ve soğutma saatleri
Data center energy wai_datacenter_energy
Copy
Fit a residential block on a 40 × 60 m parcel at 39.93, 32.86 (Ankara) with FAR 2.0 and coverage 0.40
Building design wai_design_building
Copy
Fit a residential block on a 40 × 60 m parcel at 38.42, 27.13 (İzmir) with FAR 1.5 and coverage 0.40
Building design wai_design_building
Copy
Fit a residential block on a 40 × 60 m parcel at 40.19, 29.06 (Bursa) with FAR 2.5 and coverage 0.40
Building design wai_design_building
Copy
Design a duplex villa with pool and 2-car garage on a 1,000 m² plot at 36.90, 30.71 (Antalya)
House design wai_design_house
Copy
Design a duplex villa with pool and 2-car garage on a 1,000 m² plot at 38.42, 27.13 (İzmir)
House design wai_design_house
Copy
Bodrum'da 800 m² arsaya havuzlu, garajlı tripleks villa yerleştir ve raporunu çıkar
House design wai_design_house
Copy
Ankara'da 30 × 50 m parsele TAKS 0,40 KAKS 2,0 ile konut bloğu yerleştir
Building design wai_design_building
Copy
10 MW güneş santralinin LCOE değeri: 1.650 kWh/kWp, 500 €/kW yatırım, %8 iskonto
Calculator wai_calculate
Copy
20 MW / 80 MWh BESS için arbitraj ve dengeleme geliri hesabı
Calculator wai_calculate
Copy
400 A, 200 m, 0,4 kV bakır kablo kesiti ve gerilim düşümü
Calculator wai_calculate
Copy
50 MW RES projesinin IRR, NPV ve geri dönüş süresi, 60 €/MWh satış
Calculator wai_calculate
Copy
Industrial and household electricity prices in Türkiye (Eurostat), with inflation and GDP growth
Official data wai_official_data
Copy
Open public tenders for solar, wind and battery storage in Türkiye
Official data wai_official_data
Copy
Public holidays in Türkiye in 2027 for the construction calendar
Official data wai_official_data
Copy
Türkiye'de sanayi ve konut elektrik fiyatları, enflasyon ve büyüme (Eurostat, Dünya Bankası)
Official data wai_official_data
Copy
Yargıtay'ın yüklenici gecikme cezası hakkındaki kararları
Official data wai_official_data
Copy
Yargıtay'ın kira tespit davalarına ilişkin güncel kararları
Official data wai_official_data
Copy
Türkiye'de 2027 resmi tatilleri - şantiye takvimi için
Official data wai_official_data
Copy
Best hiking trails near Kaçkar Mountains, Rize with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Lycian Way, Fethiye with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Cappadocia, Göreme with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Uludağ, Bursa with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Ida Mountain (Kazdağları) with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Ayder Plateau, Rize with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Belgrad Forest, İstanbul with length, ascent and a map
Trails wai_trails
Copy
Kaçkar Dağları yakınındaki yürüyüş rotaları: uzunluk, tırmanış ve harita
Trails wai_trails
Copy
Likya Yolu yakınındaki yürüyüş rotaları: uzunluk, tırmanış ve harita
Trails wai_trails
Copy
Kapadokya yakınındaki yürüyüş rotaları: uzunluk, tırmanış ve harita
Trails wai_trails
Copy
Uludağ yakınındaki yürüyüş rotaları: uzunluk, tırmanış ve harita
Trails wai_trails
Copy
Güneş santrali için 300 kW string inverter üreticileri ve ürün aileleri
Equipment wai_equipment
Copy
FIDIC sözleşmesinde yüklenici riskleri taraması
Skills wai_skills
Copy
100 MW güneş santrali için şebeke bağlantı adımları
Skills wai_skills
Copy
Karaman'da 50 MWp GES + 25 MW / 100 MWh BESS hibrit santral sahası çiz
Site drawing wai_draw_site
Copy
Konya Karapınar'da 100 MWp güneş santrali saha yerleşimi ve metrajı
Site drawing wai_draw_site
Copy
Çanakkale'de 60 MW rüzgâr santrali türbin yerleşimi
Site drawing wai_draw_site
Copy
İzmir'de 20 MW yeşil hidrojen elektrolizör tesisi sahası
Site drawing wai_draw_site
Copy
Ankara'da 154/33 kV, 2 × 100 MVA trafo merkezi yerleşimi
Site drawing wai_draw_site
Copy
Gaziantep'te 10 MWp çatı ve arazi GES, fabrika için 5 MWh batarya
Site drawing wai_draw_site
Copy
Antalya'da 6 katlı otelin ısıtma ve soğutma yükleri
Building energy wai_building_energy
Copy
Erzurum'da 3 katlı okulun ısı kaybı ve yakıt ihtiyacı
Building energy wai_building_energy
Copy
Bursa'da tek katlı 120 × 60 m fabrikanın soğutma yükü
Building energy wai_building_energy
Copy
Adana'da 8 katlı konut bloğunun yıllık enerji ihtiyacı
Building energy wai_building_energy
Copy
Kayseri'de 50 MW veri merkezinin serbest soğutma saatleri
Data center energy wai_datacenter_energy
Copy
Türkiye'de güneş ve rüzgâr ihaleleri (YEKA) ve BESS kapasite tahsisi
Official data wai_official_data
Copy
Türkiye'de hibrit santral ve depolamalı santral mevzuatı (EPDK)
Official data wai_official_data
Copy
Romanya'da BESS projeleri için şebeke bağlantı adımları
Official data wai_official_data
Copy
Dünya Bankası finansmanlı Türkiye enerji ihaleleri
Official data wai_official_data
Copy
5 MW güneş santralinin 25 yıllık başabaş elektrik fiyatı
Calculator wai_calculate
Copy
33 kV, 40 MVA trafonun kısa devre akımı
Calculator wai_calculate
Copy
100 MW RES için borç servis karşılama oranı (DSCR), 55 €/MWh
Calculator wai_calculate
Copy
Kazdağları ve Ida Dağı bisiklet rotaları
Trails wai_trails
Copy
Rize Ayder yaylası yürüyüş parkurları
Trails wai_trails
Copy
European Union
Draw a hybrid plant at 37.60, 14.02 (Sicily, Italy): 50 MWp PV + 25 MW / 100 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 50 MW wind farm layout at 45.46, 9.19 (Milan, Italy) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 45.76, 4.84 (Lyon, France): 50 MWp PV + 25 MW / 100 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 50 MW green hydrogen electrolyser plant at 42.70, 23.32 (Sofia, Bulgaria)
Site drawing wai_draw_site
Copy
Draw a 100 MWp solar PV farm layout at 51.92, 4.48 (Rotterdam, Netherlands) with its quantities
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 43.30, 5.37 (Marseille, France) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 20 MW green hydrogen electrolyser plant at 38.72, -9.14 (Lisbon, Portugal)
Site drawing wai_draw_site
Copy
Draw a 20 MW green hydrogen electrolyser plant at 45.76, 4.84 (Lyon, France)
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 44.43, 26.10 (Bucharest, Romania) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 42.70, 23.32 (Sofia, Bulgaria): 50 MWp PV + 25 MW / 100 MWh BESS
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 48.21, 16.37 (Vienna, Austria): 200 MWp PV + 100 MW / 400 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 20 MWp solar PV farm layout at 43.30, 5.37 (Marseille, France) with its quantities
Site drawing wai_draw_site
Copy
Draw a 50 MWp solar PV farm layout at 48.14, 11.58 (Munich, Germany) with its quantities
Site drawing wai_draw_site
Copy
Draw a 100 MWp solar PV farm layout at 48.21, 16.37 (Vienna, Austria) with its quantities
Site drawing wai_draw_site
Copy
Draw a 10 MW green hydrogen electrolyser plant at 52.52, 13.40 (Berlin, Germany)
Site drawing wai_draw_site
Copy
Draw a 200 MW / 800 MWh battery storage (BESS) site at 45.76, 4.84 (Lyon, France)
Site drawing wai_draw_site
Copy
Draw a 50 MW green hydrogen electrolyser plant at 52.23, 21.01 (Warsaw, Poland)
Site drawing wai_draw_site
Copy
Draw a 50 MW wind farm layout at 45.76, 4.84 (Lyon, France) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 100 MWp solar PV farm layout at 44.43, 26.10 (Bucharest, Romania) with its quantities
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 52.52, 13.40 (Berlin, Germany) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 10 MW green hydrogen electrolyser plant at 40.42, -3.70 (Madrid, Spain)
Site drawing wai_draw_site
Copy
Draw a 100 MWp solar PV farm layout at 37.98, 23.73 (Athens, Greece) with its quantities
Site drawing wai_draw_site
Copy
Draw a 200 MW / 800 MWh battery storage (BESS) site at 37.98, 23.73 (Athens, Greece)
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 44.18, 28.63 (Constanța, Romania): 100 MWp PV + 50 MW / 200 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 20 MW data center campus at 51.92, 4.48 (Rotterdam, Netherlands) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 52.23, 21.01 (Warsaw, Poland): 100 MWp PV + 50 MW / 200 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 20 MW data center campus at 37.39, -5.98 (Seville, Spain) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 150 MW wind farm layout at 48.14, 11.58 (Munich, Germany) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 48.14, 11.58 (Munich, Germany) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 45.76, 4.84 (Lyon, France) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 50 MW data center campus at 48.21, 16.37 (Vienna, Austria) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 50 MWp solar PV farm layout at 37.60, 14.02 (Sicily, Italy) with its quantities
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 52.23, 21.01 (Warsaw, Poland) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 50 MW / 200 MWh battery storage (BESS) site at 38.72, -9.14 (Lisbon, Portugal)
Site drawing wai_draw_site
Copy
Draw a 50 MWp solar PV farm layout at 42.70, 23.32 (Sofia, Bulgaria) with its quantities
Site drawing wai_draw_site
Copy
Draw a 200 MWp solar PV farm layout at 52.52, 13.40 (Berlin, Germany) with its quantities
Site drawing wai_draw_site
Copy
Draw a 50 MWp solar PV farm layout at 38.72, -9.14 (Lisbon, Portugal) with its quantities
Site drawing wai_draw_site
Copy
Draw a 20 MW data center campus at 42.70, 23.32 (Sofia, Bulgaria) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 45.46, 9.19 (Milan, Italy): 200 MWp PV + 100 MW / 400 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 100 MW / 400 MWh battery storage (BESS) site at 51.92, 4.48 (Rotterdam, Netherlands)
Site drawing wai_draw_site
Copy
Draw a 100 MWp solar PV farm layout at 45.46, 9.19 (Milan, Italy) with its quantities
Site drawing wai_draw_site
Copy
Draw a 150 MW wind farm layout at 52.23, 21.01 (Warsaw, Poland) with turbine spacing
Site drawing wai_draw_site
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in Marseille, France (43.30, 5.37)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a single-storey factory 120 × 60 m in Sofia, Bulgaria (42.70, 23.32)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 4-storey hospital 80 × 40 m in Sicily, Italy (37.60, 14.02)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 8-storey residential block 30 × 18 m in Athens, Greece (37.98, 23.73)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 6-storey hotel 60 × 20 m in Constanța, Romania (44.18, 28.63)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 4-storey hospital 80 × 40 m in Lyon, France (45.76, 4.84)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 6-storey hotel 60 × 20 m in Lisbon, Portugal (38.72, -9.14)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a single-storey factory 120 × 60 m in Milan, Italy (45.46, 9.19)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 8-storey residential block 30 × 18 m in Warsaw, Poland (52.23, 21.01)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in Sofia, Bulgaria (42.70, 23.32)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 5-storey office building 40 × 20 m in Sicily, Italy (37.60, 14.02)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 6-storey hotel 60 × 20 m in Athens, Greece (37.98, 23.73)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 6-storey hotel 60 × 20 m in Sicily, Italy (37.60, 14.02)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 5-storey office building 40 × 20 m in Athens, Greece (37.98, 23.73)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 8-storey residential block 30 × 18 m in Lisbon, Portugal (38.72, -9.14)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 8-storey residential block 30 × 18 m in Marseille, France (43.30, 5.37)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in Munich, Germany (48.14, 11.58)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in Lisbon, Portugal (38.72, -9.14)
Building energy wai_building_energy
Copy
PUE, free-cooling hours and water use of a 20 MW AI (high-density) data center in Berlin, Germany (52.52, 13.40)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 10 MW data center in Rotterdam, Netherlands (51.92, 4.48)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 100 MW AI (high-density) data center in Milan, Italy (45.46, 9.19)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 10 MW AI (high-density) data center in Madrid, Spain (40.42, -3.70)
Data center energy wai_datacenter_energy
Copy
Fit a residential block on a 40 × 60 m parcel at 44.43, 26.10 (Bucharest, Romania) with FAR 3.0 and coverage 0.40
Building design wai_design_building
Copy
Fit a residential block on a 40 × 60 m parcel at 38.72, -9.14 (Lisbon, Portugal) with FAR 2.0 and coverage 0.40
Building design wai_design_building
Copy
Design a duplex villa with pool and 2-car garage on a 1,000 m² plot at 37.98, 23.73 (Athens, Greece)
House design wai_design_house
Copy
Design a duplex villa with pool and 2-car garage on a 1,000 m² plot at 38.72, -9.14 (Lisbon, Portugal)
House design wai_design_house
Copy
Industrial and household electricity prices in Romania (Eurostat), with inflation and GDP growth
Official data wai_official_data
Copy
Open public tenders for solar, wind and battery storage in Romania
Official data wai_official_data
Copy
Industrial and household electricity prices in Germany (Eurostat), with inflation and GDP growth
Official data wai_official_data
Copy
Open public tenders for solar, wind and battery storage in Germany
Official data wai_official_data
Copy
Industrial and household electricity prices in Spain (Eurostat), with inflation and GDP growth
Official data wai_official_data
Copy
Open public tenders for solar, wind and battery storage in Spain
Official data wai_official_data
Copy
Industrial and household electricity prices in Italy (Eurostat), with inflation and GDP growth
Official data wai_official_data
Copy
Open public tenders for solar, wind and battery storage in Italy
Official data wai_official_data
Copy
Industrial and household electricity prices in France (Eurostat), with inflation and GDP growth
Official data wai_official_data
Copy
Open public tenders for solar, wind and battery storage in France
Official data wai_official_data
Copy
Industrial and household electricity prices in Poland (Eurostat), with inflation and GDP growth
Official data wai_official_data
Copy
Open public tenders for solar, wind and battery storage in Poland
Official data wai_official_data
Copy
Industrial and household electricity prices in Greece (Eurostat), with inflation and GDP growth
Official data wai_official_data
Copy
Open public tenders for solar, wind and battery storage in Greece
Official data wai_official_data
Copy
Industrial and household electricity prices in Bulgaria (Eurostat), with inflation and GDP growth
Official data wai_official_data
Copy
Open public tenders for solar, wind and battery storage in Bulgaria
Official data wai_official_data
Copy
Industrial and household electricity prices in Portugal (Eurostat), with inflation and GDP growth
Official data wai_official_data
Copy
Open public tenders for solar, wind and battery storage in Portugal
Official data wai_official_data
Copy
Industrial and household electricity prices in Netherlands (Eurostat), with inflation and GDP growth
Official data wai_official_data
Copy
Open public tenders for solar, wind and battery storage in Netherlands
Official data wai_official_data
Copy
Industrial and household electricity prices in Hungary (Eurostat), with inflation and GDP growth
Official data wai_official_data
Copy
Open public tenders for solar, wind and battery storage in Hungary
Official data wai_official_data
Copy
Current ECB key interest rates and what they mean for project financing
Official data wai_official_data
Copy
EU rules on battery passports and battery due diligence (EUR-Lex)
Official data wai_official_data
Copy
EU Net-Zero Industry Act requirements for renewable tenders
Official data wai_official_data
Copy
EU Electricity Market Design reform: what changes for PPAs and CfDs
Official data wai_official_data
Copy
Public holidays in Romania, Germany and Spain in 2027
Official data wai_official_data
Copy
Recent scholarly papers on agrivoltaics yield and crop impact (OpenAlex)
Official data wai_official_data
Copy
Counterparty check of a supplier website before signing a contract
Official data wai_official_data
Copy
Check an EU VAT number and the company behind it (VIES)
Official data wai_official_data
Copy
UK solar and battery tenders on Find a Tender
Official data wai_official_data
Copy
EU CBAM rules for steel and aluminium imports
Official data wai_official_data
Copy
EU taxonomy criteria for solar, wind and hydro projects
Official data wai_official_data
Copy
Best hiking trails near Dolomites, Italy with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Chamonix, France with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Picos de Europa, Spain with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Black Forest, Germany with length, ascent and a map
Trails wai_trails
Copy
Best cycling trails near Transfăgărășan, Romania with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Madeira, Portugal with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Samaria Gorge, Crete with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Tatra Mountains, Poland with length, ascent and a map
Trails wai_trails
Copy
PUE and cooling of a 100 MW AI data center campus in Seville, Spain (37.39, -5.98)
Data center energy wai_datacenter_energy
Copy
PUE and cooling of a 100 MW AI data center campus in Lyon, France (45.76, 4.84)
Data center energy wai_datacenter_energy
Copy
Draw a 100 MW data center campus at 37.39, -5.98 (Seville, Spain) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 50 MWp solar PV farm layout at 37.39, -5.98 (Seville, Spain) with its quantities
Site drawing wai_draw_site
Copy
Draw a 100 MW wind farm layout at 44.43, 26.10 (Bucharest, Romania) with turbine spacing
Site drawing wai_draw_site
Copy
United States
Draw a 20 MW green hydrogen electrolyser plant at 41.88, -87.63 (Chicago, Illinois)
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 39.74, -104.99 (Denver, Colorado) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 10 MW green hydrogen electrolyser plant at 33.75, -84.39 (Atlanta, Georgia)
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 34.05, -118.24 (Los Angeles, California) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 100 MW wind farm layout at 35.01, -117.00 (Mojave Desert, California) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 100 MWp solar PV farm layout at 33.75, -84.39 (Atlanta, Georgia) with its quantities
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 39.74, -104.99 (Denver, Colorado): 200 MWp PV + 100 MW / 400 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 200 MWp solar PV farm layout at 33.45, -112.07 (Phoenix, Arizona) with its quantities
Site drawing wai_draw_site
Copy
Draw a 50 MWp solar PV farm layout at 40.71, -74.01 (New York) with its quantities
Site drawing wai_draw_site
Copy
Draw a 20 MWp solar PV farm layout at 29.76, -95.37 (Houston, Texas) with its quantities
Site drawing wai_draw_site
Copy
Draw a 100 MWp solar PV farm layout at 39.74, -104.99 (Denver, Colorado) with its quantities
Site drawing wai_draw_site
Copy
Draw a 100 MW / 400 MWh battery storage (BESS) site at 34.05, -118.24 (Los Angeles, California)
Site drawing wai_draw_site
Copy
Draw a 50 MW green hydrogen electrolyser plant at 35.01, -117.00 (Mojave Desert, California)
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 33.45, -112.07 (Phoenix, Arizona) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 150 MW wind farm layout at 33.45, -112.07 (Phoenix, Arizona) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 100 MW / 400 MWh battery storage (BESS) site at 35.01, -117.00 (Mojave Desert, California)
Site drawing wai_draw_site
Copy
Draw a 50 MW green hydrogen electrolyser plant at 31.85, -102.37 (West Texas)
Site drawing wai_draw_site
Copy
Draw a 10 MW green hydrogen electrolyser plant at 33.45, -112.07 (Phoenix, Arizona)
Site drawing wai_draw_site
Copy
Draw a 200 MW / 800 MWh battery storage (BESS) site at 36.17, -115.14 (Las Vegas, Nevada)
Site drawing wai_draw_site
Copy
Draw a 10 MW green hydrogen electrolyser plant at 39.74, -104.99 (Denver, Colorado)
Site drawing wai_draw_site
Copy
Draw a 200 MW / 800 MWh battery storage (BESS) site at 41.88, -87.63 (Chicago, Illinois)
Site drawing wai_draw_site
Copy
Draw a 150 MW wind farm layout at 40.71, -74.01 (New York) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 50 MW / 200 MWh battery storage (BESS) site at 40.71, -74.01 (New York)
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 35.01, -117.00 (Mojave Desert, California): 100 MWp PV + 50 MW / 200 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 50 MW / 200 MWh battery storage (BESS) site at 32.78, -96.80 (Dallas, Texas)
Site drawing wai_draw_site
Copy
Draw a 50 MW green hydrogen electrolyser plant at 29.76, -95.37 (Houston, Texas)
Site drawing wai_draw_site
Copy
Draw a 20 MW data center campus at 29.76, -95.37 (Houston, Texas) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 50 MWp solar PV farm layout at 35.01, -117.00 (Mojave Desert, California) with its quantities
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 41.88, -87.63 (Chicago, Illinois): 50 MWp PV + 25 MW / 100 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 50 MW wind farm layout at 41.88, -87.63 (Chicago, Illinois) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 33.45, -112.07 (Phoenix, Arizona): 100 MWp PV + 50 MW / 200 MWh BESS
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 33.75, -84.39 (Atlanta, Georgia): 200 MWp PV + 100 MW / 400 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 150 MW wind farm layout at 39.74, -104.99 (Denver, Colorado) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 50 MW wind farm layout at 34.05, -118.24 (Los Angeles, California) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 150 MW wind farm layout at 29.76, -95.37 (Houston, Texas) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 36.17, -115.14 (Las Vegas, Nevada): 50 MWp PV + 25 MW / 100 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 50 MW data center campus at 32.78, -96.80 (Dallas, Texas) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 150 MW wind farm layout at 36.17, -115.14 (Las Vegas, Nevada) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 200 MWp solar PV farm layout at 35.08, -106.65 (Albuquerque, New Mexico) with its quantities
Site drawing wai_draw_site
Copy
Draw a 20 MW data center campus at 31.85, -102.37 (West Texas) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 41.88, -87.63 (Chicago, Illinois) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 32.78, -96.80 (Dallas, Texas): 50 MWp PV + 25 MW / 100 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 50 MWp solar PV farm layout at 41.88, -87.63 (Chicago, Illinois) with its quantities
Site drawing wai_draw_site
Copy
Draw a 10 MW green hydrogen electrolyser plant at 32.78, -96.80 (Dallas, Texas)
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 40.71, -74.01 (New York): 100 MWp PV + 50 MW / 200 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 10 MW green hydrogen electrolyser plant at 35.08, -106.65 (Albuquerque, New Mexico)
Site drawing wai_draw_site
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in New York (40.71, -74.01)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a single-storey factory 120 × 60 m in Los Angeles, California (34.05, -118.24)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 8-storey residential block 30 × 18 m in Atlanta, Georgia (33.75, -84.39)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in Phoenix, Arizona (33.45, -112.07)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 4-storey hospital 80 × 40 m in Denver, Colorado (39.74, -104.99)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in West Texas (31.85, -102.37)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 8-storey residential block 30 × 18 m in Las Vegas, Nevada (36.17, -115.14)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 6-storey hotel 60 × 20 m in Albuquerque, New Mexico (35.08, -106.65)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a single-storey factory 120 × 60 m in Phoenix, Arizona (33.45, -112.07)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 8-storey residential block 30 × 18 m in Houston, Texas (29.76, -95.37)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a single-storey factory 120 × 60 m in West Texas (31.85, -102.37)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 4-storey hospital 80 × 40 m in Los Angeles, California (34.05, -118.24)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 8-storey residential block 30 × 18 m in Dallas, Texas (32.78, -96.80)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a single-storey factory 120 × 60 m in Denver, Colorado (39.74, -104.99)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 8-storey residential block 30 × 18 m in New York (40.71, -74.01)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 5-storey office building 40 × 20 m in Phoenix, Arizona (33.45, -112.07)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 5-storey office building 40 × 20 m in Albuquerque, New Mexico (35.08, -106.65)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in Dallas, Texas (32.78, -96.80)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a single-storey factory 120 × 60 m in Dallas, Texas (32.78, -96.80)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a single-storey factory 120 × 60 m in Houston, Texas (29.76, -95.37)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 5-storey office building 40 × 20 m in Dallas, Texas (32.78, -96.80)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 6-storey hotel 60 × 20 m in Los Angeles, California (34.05, -118.24)
Building energy wai_building_energy
Copy
PUE, free-cooling hours and water use of a 20 MW AI (high-density) data center in Houston, Texas (29.76, -95.37)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 10 MW data center in Phoenix, Arizona (33.45, -112.07)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 50 MW data center in Las Vegas, Nevada (36.17, -115.14)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 50 MW data center in Dallas, Texas (32.78, -96.80)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 100 MW data center in New York (40.71, -74.01)
Data center energy wai_datacenter_energy
Copy
Fit a residential block on a 40 × 60 m parcel at 32.78, -96.80 (Dallas, Texas) with FAR 4.0 and coverage 0.40
Building design wai_design_building
Copy
Design a duplex villa with pool and 2-car garage on a 1,000 m² plot at 34.05, -118.24 (Los Angeles, California)
House design wai_design_house
Copy
GDP per capita, inflation, access to electricity and renewable share in United States (World Bank)
Official data wai_official_data
Copy
World Bank-financed procurement for power and grid projects in United States
Official data wai_official_data
Copy
Best hiking trails near Yosemite, California with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Grand Canyon, Arizona with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Zion, Utah with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Rocky Mountains, Colorado with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Appalachian Trail, Georgia with length, ascent and a map
Trails wai_trails
Copy
Best cycling trails near Moab, Utah with length, ascent and a map
Trails wai_trails
Copy
PUE and cooling of a 100 MW AI data center campus in West Texas (31.85, -102.37)
Data center energy wai_datacenter_energy
Copy
PUE and cooling of a 100 MW AI data center campus in Mojave Desert, California (35.01, -117.00)
Data center energy wai_datacenter_energy
Copy
PUE and cooling of a 100 MW AI data center campus in Atlanta, Georgia (33.75, -84.39)
Data center energy wai_datacenter_energy
Copy
PUE and cooling of a 100 MW AI data center campus in Denver, Colorado (39.74, -104.99)
Data center energy wai_datacenter_energy
Copy
PUE and cooling of a 100 MW AI data center campus in Albuquerque, New Mexico (35.08, -106.65)
Data center energy wai_datacenter_energy
Copy
Worldwide
Draw a 50 MW wind farm layout at 24.86, 67.01 (Karachi, Pakistan) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 150 MW wind farm layout at 40.41, 49.87 (Baku, Azerbaijan) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 20 MW data center campus at 26.90, 73.00 (Rajasthan, India) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 100 MW wind farm layout at -33.45, -70.67 (Santiago, Chile) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 10 MW green hydrogen electrolyser plant at -33.45, -70.67 (Santiago, Chile)
Site drawing wai_draw_site
Copy
Draw a 50 MWp solar PV farm layout at -33.87, 151.21 (Sydney, Australia) with its quantities
Site drawing wai_draw_site
Copy
Draw a 20 MWp solar PV farm layout at 25.20, 55.27 (Dubai, UAE) with its quantities
Site drawing wai_draw_site
Copy
Draw a 20 MW green hydrogen electrolyser plant at 24.71, 46.68 (Riyadh, Saudi Arabia)
Site drawing wai_draw_site
Copy
Draw a 50 MW wind farm layout at -23.55, -46.63 (São Paulo, Brazil) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a hybrid plant at -33.87, 151.21 (Sydney, Australia): 100 MWp PV + 50 MW / 200 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 20 MW data center campus at 33.57, -7.59 (Casablanca, Morocco) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 20 MW green hydrogen electrolyser plant at 24.86, 67.01 (Karachi, Pakistan)
Site drawing wai_draw_site
Copy
Draw a 100 MW data center campus at 19.08, 72.88 (Mumbai, India) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 50 MW data center campus at 25.20, 55.27 (Dubai, UAE) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 50 MW data center campus at -33.87, 151.21 (Sydney, Australia) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 150 MW wind farm layout at 26.90, 73.00 (Rajasthan, India) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a 20 MW data center campus at -23.55, -46.63 (São Paulo, Brazil) with substation and cooling
Site drawing wai_draw_site
Copy
Draw a 20 MWp solar PV farm layout at -33.45, -70.67 (Santiago, Chile) with its quantities
Site drawing wai_draw_site
Copy
Draw a 50 MWp solar PV farm layout at 33.57, -7.59 (Casablanca, Morocco) with its quantities
Site drawing wai_draw_site
Copy
Draw a 50 MW wind farm layout at 19.08, 72.88 (Mumbai, India) with turbine spacing
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 6.52, 3.38 (Lagos, Nigeria): 50 MWp PV + 25 MW / 100 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 100 MW / 400 MWh battery storage (BESS) site at 24.86, 67.01 (Karachi, Pakistan)
Site drawing wai_draw_site
Copy
Draw a 154/33 kV substation with 2 × 100 MVA transformers and its single-line quantities
Site drawing wai_draw_site
Copy
Draw a 380/154 kV substation with 2 × 100 MVA transformers and its single-line quantities
Site drawing wai_draw_site
Copy
Draw a 110/20 kV substation with 2 × 100 MVA transformers and its single-line quantities
Site drawing wai_draw_site
Copy
Draw a 220/33 kV substation with 3 × 100 MVA transformers and its single-line quantities
Site drawing wai_draw_site
Copy
Draw a 400/132 kV substation with 2 × 100 MVA transformers and its single-line quantities
Site drawing wai_draw_site
Copy
Draw an EV fast-charging hub with 20 × 150 kW chargers and its MV connection
Site drawing wai_draw_site
Copy
Draw a 5 MWp solar carport on a 4 ha parking lot
Site drawing wai_draw_site
Copy
Draw a 2 MWp rooftop and ground solar system for a factory with 1 MWh battery
Site drawing wai_draw_site
Copy
Draw a 33 kV cable route and switching station for a 100 MW solar farm
Site drawing wai_draw_site
Copy
Heating and cooling loads and yearly energy of a 4-storey hospital 80 × 40 m in Almaty, Kazakhstan (43.24, 76.89)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 8-storey residential block 30 × 18 m in Casablanca, Morocco (33.57, -7.59)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in Singapore (1.35, 103.82)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 4-storey hospital 80 × 40 m in Singapore (1.35, 103.82)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 6-storey hotel 60 × 20 m in Nairobi, Kenya (-1.29, 36.82)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a single-storey factory 120 × 60 m in Sydney, Australia (-33.87, 151.21)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 8-storey residential block 30 × 18 m in Riyadh, Saudi Arabia (24.71, 46.68)
Building energy wai_building_energy
Copy
Heating and cooling loads and yearly energy of a 3-storey school 50 × 25 m in Almaty, Kazakhstan (43.24, 76.89)
Building energy wai_building_energy
Copy
PUE, free-cooling hours and water use of a 10 MW AI (high-density) data center in Dubai, UAE (25.20, 55.27)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 50 MW data center in Riyadh, Saudi Arabia (24.71, 46.68)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 20 MW AI (high-density) data center in Singapore (1.35, 103.82)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 20 MW data center in Tokyo, Japan (35.68, 139.69)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 10 MW AI (high-density) data center in Almaty, Kazakhstan (43.24, 76.89)
Data center energy wai_datacenter_energy
Copy
PUE, free-cooling hours and water use of a 50 MW data center in NEOM, Saudi Arabia (28.00, 35.20)
Data center energy wai_datacenter_energy
Copy
Fit a residential block on a 40 × 60 m parcel at 25.20, 55.27 (Dubai, UAE) with FAR 5.0 and coverage 0.40
Building design wai_design_building
Copy
Design a duplex villa with pool and 2-car garage on a 1,000 m² plot at 25.20, 55.27 (Dubai, UAE)
House design wai_design_house
Copy
LCOE of a 20 MW solar plant with 1750 kWh/kWp, capex 650 €/kW and 7 % WACC
Calculator wai_calculate
Copy
IRR, NPV and payback of a 5 MW solar project selling at 65 €/MWh
Calculator wai_calculate
Copy
BESS revenue stacking for a 50 MW / 400 MWh battery: arbitrage, FCR and aFRR
Calculator wai_calculate
Copy
Cable size and voltage drop for 630 A over 150 m at 0.4 kV, copper XLPE
Calculator wai_calculate
Copy
Short-circuit current at the 33 kV busbar of a 63 MVA transformer with 10 % impedance
Calculator wai_calculate
Copy
Transformer size for a 10 MW load at cos φ 0.9 with 20 % reserve
Calculator wai_calculate
Copy
DSCR and debt size for a 100 MW wind project at 80 €/MWh
Calculator wai_calculate
Copy
Break-even electricity price for a 50 MW solar plant over 25 years
Calculator wai_calculate
Copy
LCOE of a 5 MW solar plant with 1600 kWh/kWp, capex 550 €/kW and 7 % WACC
Calculator wai_calculate
Copy
IRR, NPV and payback of a 5 MW solar project selling at 55 €/MWh
Calculator wai_calculate
Copy
BESS revenue stacking for a 50 MW / 100 MWh battery: arbitrage, FCR and aFRR
Calculator wai_calculate
Copy
Cable size and voltage drop for 250 A over 150 m at 0.4 kV, copper XLPE
Calculator wai_calculate
Copy
Transformer size for a 100 MW load at cos φ 0.9 with 20 % reserve
Calculator wai_calculate
Copy
DSCR and debt size for a 10 MW wind project at 80 €/MWh
Calculator wai_calculate
Copy
Break-even electricity price for a 20 MW solar plant over 25 years
Calculator wai_calculate
Copy
LCOE of a 20 MW solar plant with 1450 kWh/kWp, capex 550 €/kW and 7 % WACC
Calculator wai_calculate
Copy
IRR, NPV and payback of a 5 MW solar project selling at 80 €/MWh
Calculator wai_calculate
Copy
Cable size and voltage drop for 400 A over 300 m at 0.4 kV, copper XLPE
Calculator wai_calculate
Copy
Short-circuit current at the 33 kV busbar of a 20 MVA transformer with 10 % impedance
Calculator wai_calculate
Copy
Transformer size for a 50 MW load at cos φ 0.9 with 20 % reserve
Calculator wai_calculate
Copy
Break-even electricity price for a 10 MW solar plant over 25 years
Calculator wai_calculate
Copy
LCOE of a 20 MW solar plant with 1750 kWh/kWp, capex 550 €/kW and 7 % WACC
Calculator wai_calculate
Copy
IRR, NPV and payback of a 10 MW solar project selling at 55 €/MWh
Calculator wai_calculate
Copy
BESS revenue stacking for a 20 MW / 100 MWh battery: arbitrage, FCR and aFRR
Calculator wai_calculate
Copy
Short-circuit current at the 33 kV busbar of a 40 MVA transformer with 10 % impedance
Calculator wai_calculate
Copy
Transformer size for a 5 MW load at cos φ 0.9 with 20 % reserve
Calculator wai_calculate
Copy
DSCR and debt size for a 5 MW wind project at 45 €/MWh
Calculator wai_calculate
Copy
LCOE of a 10 MW solar plant with 1750 kWh/kWp, capex 450 €/kW and 7 % WACC
Calculator wai_calculate
Copy
BESS revenue stacking for a 10 MW / 200 MWh battery: arbitrage, FCR and aFRR
Calculator wai_calculate
Copy
Cable size and voltage drop for 630 A over 80 m at 0.4 kV, copper XLPE
Calculator wai_calculate
Copy
DSCR and debt size for a 10 MW wind project at 55 €/MWh
Calculator wai_calculate
Copy
Break-even electricity price for a 100 MW solar plant over 25 years
Calculator wai_calculate
Copy
LCOE of a 5 MW solar plant with 1450 kWh/kWp, capex 550 €/kW and 7 % WACC
Calculator wai_calculate
Copy
IRR, NPV and payback of a 50 MW solar project selling at 80 €/MWh
Calculator wai_calculate
Copy
BESS revenue stacking for a 100 MW / 200 MWh battery: arbitrage, FCR and aFRR
Calculator wai_calculate
Copy
Cable size and voltage drop for 400 A over 80 m at 0.4 kV, copper XLPE
Calculator wai_calculate
Copy
Short-circuit current at the 33 kV busbar of a 100 MVA transformer with 10 % impedance
Calculator wai_calculate
Copy
DSCR and debt size for a 50 MW wind project at 65 €/MWh
Calculator wai_calculate
Copy
Break-even electricity price for a 5 MW solar plant over 25 years
Calculator wai_calculate
Copy
LCOE of a 50 MW solar plant with 1450 kWh/kWp, capex 450 €/kW and 7 % WACC
Calculator wai_calculate
Copy
IRR, NPV and payback of a 50 MW solar project selling at 55 €/MWh
Calculator wai_calculate
Copy
BESS revenue stacking for a 5 MW / 100 MWh battery: arbitrage, FCR and aFRR
Calculator wai_calculate
Copy
Cable size and voltage drop for 250 A over 80 m at 0.4 kV, copper XLPE
Calculator wai_calculate
Copy
Transformer size for a 20 MW load at cos φ 0.9 with 20 % reserve
Calculator wai_calculate
Copy
DSCR and debt size for a 5 MW wind project at 80 €/MWh
Calculator wai_calculate
Copy
LCOE of a 50 MW solar plant with 1450 kWh/kWp, capex 550 €/kW and 7 % WACC
Calculator wai_calculate
Copy
IRR, NPV and payback of a 20 MW solar project selling at 65 €/MWh
Calculator wai_calculate
Copy
DSCR and debt size for a 50 MW wind project at 55 €/MWh
Calculator wai_calculate
Copy
GDP per capita, inflation, access to electricity and renewable share in Saudi Arabia (World Bank)
Official data wai_official_data
Copy
World Bank-financed procurement for power and grid projects in Saudi Arabia
Official data wai_official_data
Copy
GDP per capita, inflation, access to electricity and renewable share in Egypt (World Bank)
Official data wai_official_data
Copy
World Bank-financed procurement for power and grid projects in Egypt
Official data wai_official_data
Copy
GDP per capita, inflation, access to electricity and renewable share in India (World Bank)
Official data wai_official_data
Copy
World Bank-financed procurement for power and grid projects in India
Official data wai_official_data
Copy
GDP per capita, inflation, access to electricity and renewable share in Brazil (World Bank)
Official data wai_official_data
Copy
World Bank-financed procurement for power and grid projects in Brazil
Official data wai_official_data
Copy
GDP per capita, inflation, access to electricity and renewable share in South Africa (World Bank)
Official data wai_official_data
Copy
World Bank-financed procurement for power and grid projects in South Africa
Official data wai_official_data
Copy
GDP per capita, inflation, access to electricity and renewable share in Kazakhstan (World Bank)
Official data wai_official_data
Copy
World Bank-financed procurement for power and grid projects in Kazakhstan
Official data wai_official_data
Copy
GDP per capita, inflation, access to electricity and renewable share in Pakistan (World Bank)
Official data wai_official_data
Copy
World Bank-financed procurement for power and grid projects in Pakistan
Official data wai_official_data
Copy
GDP per capita, inflation, access to electricity and renewable share in Nigeria (World Bank)
Official data wai_official_data
Copy
World Bank-financed procurement for power and grid projects in Nigeria
Official data wai_official_data
Copy
GDP per capita, inflation, access to electricity and renewable share in Morocco (World Bank)
Official data wai_official_data
Copy
World Bank-financed procurement for power and grid projects in Morocco
Official data wai_official_data
Copy
GDP per capita, inflation, access to electricity and renewable share in Indonesia (World Bank)
Official data wai_official_data
Copy
World Bank-financed procurement for power and grid projects in Indonesia
Official data wai_official_data
Copy
GDP per capita, inflation, access to electricity and renewable share in Vietnam (World Bank)
Official data wai_official_data
Copy
World Bank-financed procurement for power and grid projects in Vietnam
Official data wai_official_data
Copy
Best hiking trails near Swiss Alps, Zermatt with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Mount Kilimanjaro with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Torres del Paine, Chile with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Mount Fuji, Japan with length, ascent and a map
Trails wai_trails
Copy
Best hiking trails near Annapurna, Nepal with length, ascent and a map
Trails wai_trails
Copy
Makers and product families of utility-scale PV modules above 600 W, with ratings from their own datasheets
Equipment wai_equipment
Copy
Makers and product families of string PV inverters 250–350 kW, with ratings from their own datasheets
Equipment wai_equipment
Copy
Makers and product families of central PV inverters above 4 MW, with ratings from their own datasheets
Equipment wai_equipment
Copy
Makers and product families of BESS containers of 5 MWh, with ratings from their own datasheets
Equipment wai_equipment
Copy
Makers and product families of BESS PCS of 4–5 MW, with ratings from their own datasheets
Equipment wai_equipment
Copy
Makers and product families of wind turbines 6–7 MW onshore, with ratings from their own datasheets
Equipment wai_equipment
Copy
Makers and product families of PEM and alkaline electrolysers above 10 MW, with ratings from their own datasheets
Equipment wai_equipment
Copy
Makers and product families of power transformers 100–250 MVA, with ratings from their own datasheets
Equipment wai_equipment
Copy
Makers and product families of dry-type transformers 2–4 MVA, with ratings from their own datasheets
Equipment wai_equipment
Copy
Makers and product families of MV switchgear / RMU 36 kV, with ratings from their own datasheets
Equipment wai_equipment
Copy
Makers and product families of HV circuit breakers 170 kV, with ratings from their own datasheets
Equipment wai_equipment
Copy
Makers and product families of offshore wind turbines above 14 MW, with ratings from their own datasheets
Equipment wai_equipment
Copy
Read a solar EPC tender and list the key requirements
Skills wai_skills
Copy
FIDIC risk scan of a construction contract
Skills wai_skills
Copy
Grid connection steps and studies for a 100 MW solar plant
Skills wai_skills
Copy
Site screening checklist for a wind farm
Skills wai_skills
Copy
Hydropower project pre-feasibility checklist
Skills wai_skills
Copy
CAPEX breakdown for a 100 MW / 400 MWh BESS
Skills wai_skills
Copy
Project finance model structure for a solar PV plant
Skills wai_skills
Copy
HVDC link concept: when it beats HVAC
Skills wai_skills
Copy
Substation design checklist for a 154 kV plant
Skills wai_skills
Copy
Green hydrogen project feasibility checklist
Skills wai_skills
Copy
AutoLISP routine to draw a staircase from rise and going
AutoLISP wai_autolisp_library
Copy
AutoLISP to draw a reinforced concrete footing with rebar
AutoLISP wai_autolisp_library
Copy
AutoLISP for a retaining wall section
AutoLISP wai_autolisp_library
Copy
AutoLISP to draw steel I-beam sections
AutoLISP wai_autolisp_library
Copy
AutoLISP to draw a title block and drawing frame
AutoLISP wai_autolisp_library
Copy
AutoLISP to draw a single-line diagram symbol set
AutoLISP wai_autolisp_library
Copy
AutoLISP for a road longitudinal profile
AutoLISP wai_autolisp_library
Copy
AutoLISP to draw a flange from its standard size
AutoLISP wai_autolisp_library
Copy
Draw a 200 MW / 800 MWh battery storage (BESS) site at 40.41, 49.87 (Baku, Azerbaijan)
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 24.71, 46.68 (Riyadh, Saudi Arabia): 200 MWp PV + 100 MW / 400 MWh BESS
Site drawing wai_draw_site
Copy
Draw a hybrid plant at 28.00, 35.20 (NEOM, Saudi Arabia): 50 MWp PV + 25 MW / 100 MWh BESS
Site drawing wai_draw_site
Copy
Draw a 200 MW / 800 MWh battery storage (BESS) site at -33.87, 151.21 (Sydney, Australia)
Site drawing wai_draw_site
Copy
Draw a 50 MW / 200 MWh battery storage (BESS) site at 6.52, 3.38 (Lagos, Nigeria)
Site drawing wai_draw_site
Copy
Draw a 10 MW green hydrogen electrolyser plant at 35.68, 139.69 (Tokyo, Japan)
Site drawing wai_draw_site
Copy
Results are pre-engineering screening, not detailed design; Wai gives no prices. Full drawings (DWG / DXF / IFC / Revit), editing and reports are in
Wai ; maps and site studies in WaiMAP .
WHT Technology · [email protected]